Eaton 5.7kW 3-Phase Monitored PDU, 120V Outlets (36 5-15/20R), 208V L21-20P, 10 ft. (3.05 m) Cord, 0U Vertical, TAA

Tripp Lite by EatonSKU: 2864233

Price:
Sale price$727.63

Description

The Eaton 5.7kW 3-Phase Monitored PDU is your ultimate solution for efficient power distribution and monitoring in critical IT environments. Engineered for high-performance data centers and server rooms, this power distribution unit ensures uninterrupted power supply while providing real-time monitoring capabilities. With its robust design, versatile outlet configuration, and easy installation, the Eaton PDU stands out as a reliable partner in managing your essential power requirements.

  • High Capacity Power Distribution: The Eaton 5.7kW PDU is capable of supporting a total output capacity of 5.7kW, making it ideal for environments with high power demand.
  • Versatile Outlet Configuration: This PDU is equipped with 36 NEMA 5-15/20R outlets arranged in three single-phase output load banks, allowing for efficient distribution of power to multiple devices simultaneously.
  • Real-Time Monitoring: Featuring a visual meter with a scroll button and a PowerAlert remote monitoring interface, this PDU provides real-time current monitoring for each output phase, ensuring optimal performance and safety.
  • Easy Installation: The Eaton PDU comes with a 10 ft. (3.05 m) input cord and a NEMA L21-20P 20A (3P+N+E) plug, supporting 0U vertical rack mount installation with included mounting accessories for a streamlined setup.
  • Enhanced Reliability: To maintain connections securely, the PDU includes cord retention brackets, ensuring that your critical network equipment remains plugged in and powered at all times.

Technical Details of the Product

  • Model: PDU3VN10L2120LV
  • Total Output Capacity: 5.7kW
  • Input Voltage: 208V
  • Input Plug Type: NEMA L21-20P 20A (3P+N+E)
  • Number of Outlets: 36 x 120V NEMA 5-15/20R
  • Rack Space: 0U Vertical
  • Input Cord Length: 10 ft. (3.05 m)
  • Monitoring: Voltage, frequency, and load per-phase via built-in Ethernet interface
  • Compliance: Federal Trade Agreements Act (TAA) compliant for GSA Schedule purchases

How to Install

Installing the Eaton 5.7kW 3-Phase Monitored PDU is a straightforward process. Follow these simple steps:

  1. Prepare your rack by ensuring adequate space for the PDU installation.
  2. Using the included mounting accessories, securely attach the PDU to your rack in a vertical orientation.
  3. Connect the 10 ft. (3.05 m) input cord to your power source, making sure that the NEMA L21-20P plug fits securely.
  4. Attach your devices to the 36 available 120V outlets, ensuring that each connection is firm.
  5. If your rack supports it, utilize the tool-less button-mount installation feature for added convenience.
  6. Finally, access the PowerAlert remote monitoring interface to configure your real-time monitoring settings.

Frequently Asked Questions

  • What is the maximum output capacity of the Eaton PDU? The Eaton PDU supports a maximum output capacity of 5.7kW.
  • How many outlets does this PDU provide? This PDU includes 36 120V NEMA 5-15/20R outlets.
  • Is the installation tool-less? Yes, the Eaton PDU supports tool-less button-mount installation in compatible racks.
  • What monitoring capabilities does this product offer? The PDU features real-time monitoring of voltage, frequency, and load per-phase via a built-in Ethernet interface.
  • Is the Eaton 5.7kW PDU compliant with government standards? Yes, it is Federal Trade Agreements Act (TAA) compliant for GSA Schedule purchases.

Customer reviews

(0)

0 Out of 5 Stars


5 Stars
0
4 Stars
0
3 Stars
0
2 Stars
0
1 Star
0


Showing - Of Reviews


You may also like

Recently viewed