Description
The Eaton Tripp Lite Series 5.7kW 3-Phase Local Metered PDU is a state-of-the-art power distribution solution designed specifically for high-demand environments such as data centers and server rooms. This advanced Power Distribution Unit (PDU) offers a combination of durability, flexibility, and real-time monitoring capabilities to ensure that your critical equipment receives the power it needs without interruptions. With its robust design and multiple outlet configurations, the Eaton Tripp Lite PDU is the perfect choice for any power distribution challenge.
- Real-Time Monitoring: This PDU is equipped with three built-in digital meters that allow you to monitor current levels in amps. This feature is essential for effective load balancing and helps in preventing circuit overloads, especially as you expand your equipment.
- High-Quality Build: The rugged all-metal housing of the Eaton Tripp Lite PDU ensures durability and longevity, making it suitable for the most demanding environments. Its secure rackmount installation provides stability and easy access to all outlets.
- Flexible Outlet Configuration: The PDU boasts a total of 48 outlets, including 36 C13 outlets (208V), 6 C19 outlets (208V), and 6 NEMA 5-15/20R outlets (120V). This flexibility allows you to accommodate a diverse range of devices and their respective power requirements with ease.
- Easy Installation: Featuring a toolless button-mount installation and included cord retention brackets, setting up the Eaton Tripp Lite PDU is both quick and straightforward. The design is user-friendly, allowing for a hassle-free installation experience.
- TAA Compliant: This PDU adheres to the stringent regulations of the Trade Agreements Act (TAA), making it a compliant choice for government procurement and ideal for federal projects.
Technical Details of the Product
- Power Capacity: 5.7kW
- Input Voltage: 208/120V
- Input Type: NEMA L21-20P (3P+N+E)
- Outlets: 48 total - 36 C13 (208V), 6 C19 (208V), 6 NEMA 5-15/20R (120V)
- Length of Power Cord: 6 ft. (1.83 m)
- Mounting Style: 0U Vertical
- Compliance: TAA Compliant
- Dimensions: 70 in. / 178 cm
How to Install
Installing the Eaton Tripp Lite Series 5.7kW 3-Phase Local Metered PDU is straightforward and can be done in a few easy steps:
- Identify the suitable location in your rack for the PDU installation.
- Utilize the toolless button-mount feature to secure the PDU in place.
- Connect the 6 ft. (1.83 m) power cord to the appropriate power source such as a UPS, generator, or mains.
- Ensure compatibility of the NEMA L21-20P plug with your power input.
- Use the included cord retention brackets to organize your cables for a neat and safe installation.
- Power on the unit and monitor the current levels using the built-in digital meters to ensure proper load distribution.
Frequently Asked Questions
- What is the maximum load capacity of this PDU? The Eaton Tripp Lite Series 5.7kW PDU supports a maximum load of 5.7kW, making it suitable for powering multiple devices efficiently.
- Can this PDU be used with different voltages? This PDU is specifically designed for 208/120V systems; therefore, it is crucial to ensure that your devices are compatible with this voltage range.
- Does this PDU come with a warranty? Yes, Eaton generally provides a warranty for their products, including the Tripp Lite PDUs. Please check with the retailer or manufacturer for specific details on warranty coverage.
- Is installation difficult for this PDU? No, the installation is designed to be user-friendly with toolless button-mount features and clear instructions, making it suitable for both professionals and DIY enthusiasts.
- How do I monitor the current levels? The built-in digital meters on the PDU allow you to monitor the current levels in real-time for each phase. This feature helps you prevent overloads and maintain proper load balance effectively.
Customer reviews
Showing - Of Reviews