APC by Schneider Electric Smart-UPS SRT 10kVA RM with 208/240V to 120V 10kVA Step-Down Transformer


Price:
Sale price$13,944.53

Description

APC by Schneider Electric Smart-UPS SRT 10kVA RM with 208/240V to 120V 10kVA Step-Down Transformer

The APC Smart-UPS SRT 10kVA RM is engineered for IT professionals, data centers, and network administrators who require uncompromising uptime and clean, reliable power for critical equipment. This online, 10U rack-mount UPS delivers pure sine wave output and double-conversion technology to protect servers, storage arrays, network gear, and other essential devices from outages, brownouts, and transient disturbances. Its integrated 208/240V to 120V step-down transformer expands compatibility with common 120V equipment, enabling seamless integration into mixed-voltage facilities and helping to simplify appliance migrations in enterprise environments. Built for demanding workloads, the Smart-UPS SRT guarantees consistent power quality, reduced risk of data loss, and predictable uptime even under challenging electrical conditions.

  • Online, double-conversion protection with pure sine wave output: Maintains continuous, clean power to sensitive IT equipment, ensuring stable performance and protecting against data corruption during outages or grid fluctuations.
  • High-density 10kVA capacity in a compact 10U rack-mount footprint: Maximizes rack efficiency in data centers, edge facilities, and server rooms while delivering robust power for critical workloads and cascading devices.
  • 208/240V input to 120V output step-down transformer: Enables easy integration of 120V devices from higher-voltage mains, reducing equipment rewiring and enabling smoother deployment in mixed-voltage environments.
  • Hard-wire 3-wire installation for secure, code-compliant connections: Designed for professional install in ready-to-rack environments with standard building wiring practices, improving reliability and safety.
  • Extended runtime and management options tailored to IT uptime goals: Provides flexibility to scale runtime and integrate with monitoring systems, alerting, and control interfaces to keep critical services online during power events.

Technical Details of APC by Schneider Electric Smart-UPS SRT 10kVA RM with 208/240V to 120V 10kVA Step-Down Transformer

  • Brand: APC by Schneider Electric
  • Model: Smart-UPS SRT 10kVA RM
  • Topology: Online, double-conversion (on-line UPS)
  • Capacity: 10 kVA (rated for critical IT loads)
  • Form factor: Rack-mountable, 10U enclosure
  • Input voltage: 208/240 VAC
  • Output voltage: 120 VAC
  • Output waveform: Pure sine wave
  • Voltage transformation: Built-in step-down transformer for 208/240V to 120V conversion
  • Connections: Hard-wire 3-wire installation
  • Applications: Servers, storage, network devices, and other critical IT equipment requiring reliable, uninterrupted power
  • Installation environment: Rack-based data centers, server rooms, and edge locations that need compact, high-capacity power protection

how to install APC by Schneider Electric Smart-UPS SRT 10kVA RM with 208/240V to 120V 10kVA Step-Down Transformer

Proper installation of the APC Smart-UPS SRT 10kVA RM ensures optimal performance, safety, and uptime. Follow these guidelines to integrate the unit into a protected IT environment:

  • Plan your rack position: Choose a well-ventilated, accessible rack location with adequate clearance for airflow, service access, and cable routing. Verify that the rack mounting rails are compatible with the 10U enclosure and that there is sufficient space for ventilation and battery access.
  • Secure mounting: Install the UPS in the designated rack position using the included rail kit and hardware. Ensure the unit is level and securely fastened to minimize vibration and movement during maintenance or power cycling.
  • Prepare electrical connections: Since this model uses hard-wire 3-wire connections, connect the UPS to the appropriate building power circuit per local electrical codes. Use proper circuit breakers and grounding to ensure safe operation and compliance with electrical standards.
  • Connect IT loads and peripherals: Route critical devices—servers, storage arrays, and network gear—through the UPS’s outlets or connected distribution paths as recommended by APC documentation. Group related devices to simplify management and battery testing.
  • Configure management and monitoring: If the UPS includes optional management interfaces (e.g., serial, USB, or network card), configure monitoring credentials, alerts, and shutdown policies in the APC software or compatible third-party management systems. Enable automatic safe shutdown for protected workloads to prevent data loss during extended outages.
  • Perform a battery and function check: Once powered, run an initial self-test to verify battery health and inverter operation. Schedule periodic tests to confirm ongoing readiness, especially after changes in load or maintenance windows.
  • Document the installation: Record the location, wiring diagrams, and management settings for future maintenance and audits. Include device names, load estimates, and expected runtimes under typical and peak loads to guide operational planning.

Frequently asked questions

  • Q: What is the primary purpose of the APC Smart-UPS SRT 10kVA RM?
    A: It provides reliable, scalable power protection for critical IT equipment, delivering uninterrupted power and clean, stable output to servers, storage, and networking devices during power disturbances.
  • Q: What does the 208/240V to 120V step-down transformer do?
    A: It enables compatibility with standard 120V devices by converting higher mains voltages (208/240V) down to 120V, simplifying integration in mixed-voltage environments.
  • Q: Is this an online UPS?
    A: Yes. The SRT series uses online, double-conversion topology to continuously filter and regulate power, providing a pure sine wave output even during grid fluctuations.
  • Q: What loads can this unit protect?
    A: It is designed for critical IT workloads, including servers, storage systems, network switches, routers, and other essential equipment requiring reliable power protection in data centers and edge environments.
  • Q: How is it installed?
    A: It is rack-mountable (10U) and uses hard-wire 3-wire connections. Installation should follow local electrical codes, with appropriate mounting hardware, ventilation, and integration with management systems for monitoring and alerting.
  • Q: Can I expand runtime?
    A: Runtime can be extended with appropriately sized batteries and load management. Runtime varies with load and battery configuration; consult APC guidelines for precise runtimes based on your load profile.

Customer reviews

(0)

0 Out of 5 Stars


5 Stars
0
4 Stars
0
3 Stars
0
2 Stars
0
1 Star
0


Showing - Of Reviews


You may also like

Recently viewed