Description
APC by Schneider Electric Smart-UPS SRT 192V 5kVA and 6kVA Battery Pack TAA
The APC by Schneider Electric Smart-UPS SRT 192V 5kVA and 6kVA Battery Pack TAA is engineered to deliver dependable, extended runtime for mission-critical applications. This battery pack is designed to pair seamlessly with the Smart-UPS SRT family, providing scalable energy storage that protects sensitive equipment, preserves data integrity, and keeps essential services online during outages. Built for harsh, demanding environments, it combines robust safety features with a compact footprint, so you can deploy reliable power protection in data centers, server rooms, healthcare facilities, trading floors, and other high-stakes settings. Whether you need to bridge short interruptions or extend downtime during maintenance windows, this TAA-compliant battery pack helps you maintain business continuity with confidence.
- Extended runtime for critical loads — When power quality or duration is uncertain, this battery pack increases available runtime for servers, virtualization hosts, storage controllers, switches, and network appliances. It supports graceful shutdowns during outages and minimizes data loss, ensuring that operations resume smoothly after power returns.
- Hot-swappable, quick-replace battery design — The modular battery pack is designed for minimal downtime. In compatible systems, you can replace or upgrade batteries without powering down the UPS, reducing maintenance windows and keeping downtime to a minimum while protecting ongoing workloads.
- Seamless integration with the Smart-UPS SRT platform — Specifically engineered to work with 192V SRT configurations, this pack leverages the UPS’s advanced energy management, alarms, and status reporting. It enhances runtime predictability, simplifies capacity planning, and ensures smooth operation across the entire energy ecosystem.
- TAA-compliant for government and institutional use — This unit carries Trade Agreement Act compliance, making it suitable for procurement by government agencies, educational institutions, and other public-sector organizations that require formal compliance with purchasing standards.
- Intelligent monitoring and management — With built-in sensors, LEDs, and compatibility with APC monitoring tools, you gain real-time visibility into battery health, remaining runtime, performance metrics, and fault indicators. The result is proactive maintenance, reduced risk, and better capacity planning across your IT environment.
Technical Details of APC by Schneider Electric Smart-UPS SRT 192V 5kVA and 6kVA Battery Pack TAA
- Voltage and configuration: 192 V nominal alignment with the Smart-UPS SRT family, designed to support 5kVA and 6kVA systems
- Compatibility: Specifically engineered for APC Smart-UPS SRT 192V 5kVA/6kVA configurations, enabling scalable energy storage for demanding workloads
- Form factor and installation: Battery pack module intended for secure mounting in data-center racks or compatible enclosures; designed for straightforward integration with existing UPS hardware
- Compliance: TAA (Trade Agreement Act) compliant, suitable for government and certain institutional procurement requirements
- Runtime and protection: Provides extended backup time to protect critical devices during outages and supports orderly shutdown sequences to safeguard data integrity
- Safety and handling: Factory-sealed battery assembly with appropriate safety interlocks and handling guidance to ensure safe installation and maintenance
How to install APC by Schneider Electric Smart-UPS SRT 192V 5kVA and 6kVA Battery Pack TAA
Follow these general guidelines to install the battery pack correctly and safely. Always refer to the official user guide for model-specific instructions and safety precautions before starting.
- Power down connected equipment and disconnect power sources to ensure a safe work environment; verify that the UPS is isolated from active circuits
- Access the UPS chassis or battery compartment according to the manufacturer’s instructions, opening panels or doors as required
- Inspect the new battery pack for damage, remove packaging, and confirm all connectors and mounting hardware are present
- Mount the battery pack securely to the UPS or within the designated enclosure, align connectors properly, and connect the battery interlocks and wiring as specified
- Close panels, reconnect power to the UPS, and perform a self-test or runtime verification to ensure the new pack is recognized and functioning correctly
Frequently asked questions
-
Q: What does the 192V specification mean for this battery pack?
A: The 192V specification refers to the system voltage configuration compatible with the Smart-UPS SRT 192V platform. This battery pack is designed to support 192V UPS configurations and extend runtime for connected equipment.
-
Q: Which devices are protected by this battery pack?
A: The battery pack is intended to back up critical IT infrastructure that uses the APC Smart-UPS SRT 192V 5kVA/6kVA configurations, including servers, storage, networking gear, and other essential loads that require reliable power during outages.
-
Q: Can I replace the battery pack without turning off the UPS?
A: In compatible configurations, the design allows for hot-swappable replacement to minimize downtime. Always follow proper safety procedures and consult the manual for your specific model.
-
Q: Is this battery pack suitable for government procurement?
A: Yes. The TAA-compliant designation indicates suitability for government and public-sector procurement processes that require Trade Agreement Act compliance.
-
Q: How can I monitor the health and status of the battery pack?
A: The pack provides real-time status via the UPS display and via APC monitoring tools. You can monitor battery health, remaining runtime, and fault indicators to plan maintenance and replacements proactively.
Customer reviews
Showing - Of Reviews