Description
Eaton Basic Rack PDU 0U — 309-460P9 Input, 17.3 kW Max, 200–240V, 45A, 6 ft Cord, Three-Phase
Designed for demanding IT environments and data centers, the Eaton Basic rack PDU delivers reliable, scalable power distribution without sacrificing ease of installation. Built to withstand high-temperature operation, this 0U, rack-mountable PDU is crafted from lightweight aluminum for straightforward handling and rapid deployment in dense cabinets. With a three-phase input, it supports modern data center power architectures while offering a robust 17.3 kW maximum load to support power-hungry servers, networking gear, and storage arrays. The unit’s thoughtful design emphasizes plug retention and security, ensuring critical equipment stays powered during intense workloads and routine maintenance windows. Whether you’re outfitting a new data center or upgrading an aging rack, this Eaton G3 Basic ePDU is engineered to simplify cabling, improve airflow, and deliver dependable power with long-term reliability.
- High-capacity performance for modern data centers: This Eaton Basic PDU handles up to 17.3 kW of load with a 45A maximum current, operating on 200–240V three-phase power. The combination of a generous power rating and a compact 0U footprint makes it ideal for dense racks and environments where every watt of space matters, delivering stable voltage to servers, storage devices, switches, and other critical IT equipment.
- Flexible outlet configuration to support mixed IT assets: Outfitted with 21 C13 outlets and 12 C19 outlets, this PDU accommodates a wide range of devices, from edge servers to distribution switches. The diverse outlet mix simplifies cabling planning, reduces the need for daisy-chaining power strips, and helps maintain consistent power delivery across rack-mounted equipment while optimizing airflow and cooling within the cabinet.
- Secure cable retention for unmatched reliability: IEC outlet grip plug retention keeps plugs firmly seated, resisting accidental disconnections from cable movement or rack activity. This secure retention reduces risky power interruptions during critical operations, promoting uptime and minimizing maintenance windows caused by loose connections.
- Rugged, heat-tolerant construction with easy installation: Built from lightweight aluminum, the G3 Basic ePDU is engineered to operate reliably in hotter data center aisles, extending its service life in high-temperature environments. The 0U design and straightforward mounting process make installation quick and effortless, allowing technicians to deploy power distribution with minimal disruption to other gear in the rack.
- Optimized for scalable data center power management: The three-phase input aligns with contemporary data center power architectures, enabling efficient distribution to multiple devices from a single, compact unit. The 6 ft cord offers flexible reach to power sources, reducing strain on cables and simplifying cabinet layout while supporting future growth as rack densities increase.
Technical Details of Eaton Basic rack PDU
- SKU: 309-460P9
- Input: 200–240V
- Max Load: 17.3 kW
- Current: 45 A
- Phases: Three-phase
- Cord Length: 6 ft
- Outlets: 21 × C13, 12 × C19
- Mounting: 0U rack-mountable
How to install Eaton Basic rack PDU
- Plan the rack space: Identify a 19-inch rack or cabinet with sufficient depth and clearances to accommodate the 0U PDU and its cabling. Ensure airflow around the rear of the cabinet is not obstructed and that there is easy access to both the input power source and the outlets.
- Prepare the rack and hardware: Verify that mounting rails are level and secure. Confirm that the PDU’s mounting brackets align with the rack’s vertical rails, and have the necessary screws or fasteners ready for installation.
- Mount the PDU: Slide the PDU into the 19-inch rack, ensuring it sits flush against the rails. Secure the mounting brackets according to the manufacturer’s instructions to prevent shifting during operation or maintenance.
- Connect the input power: Route the 6 ft input cord to a suitable three-phase power source that matches the 200–240V input specification. Use proper cable management to avoid tension on the cord and keep power cables neatly organized away from data cables.
- Distribute outlets and verify operation: Connect IT devices to the 21 C13 outlets and 12 C19 outlets as needed. Power on the equipment and verify that each outlet delivers stable power. Perform a brief functional test to ensure all devices initialize correctly and monitor for any startup surges or flicker.
Frequently asked questions
- Q: What outlets are included on this Eaton Basic PDU? A: It features 21 C13 outlets and 12 C19 outlets for versatile power distribution in mixed IT environments.
- Q: What is the input specification for this PDU? A: The unit operates on 200–240V three-phase power, with a 45A rating and a maximum load of 17.3 kW.
- Q: What is the physical footprint of this PDU? A: It is a 0U rack-mountable PDU, designed to maximize rack space and minimize obstruction in dense deployments.
- Q: How long is the power cord? A: The PDU comes with a 6 ft cord to provide flexible reach to common data center power sources.
- Q: How does the outlet retention feature improve reliability? A: IEC outlet grip plug retention secures plugs in place, reducing the risk of accidental disconnections in active data center environments and during maintenance.
Customer reviews
Showing - Of Reviews