Eaton eATS T2235-C2-CNB15L 8-Outlet PDU

EatonSKU: 4683564

Price:
Sale price$1,560.99

Description

Eaton eATS T2235-C2-CNB15L 8-Outlet PDU

The Eaton eATS T2235-C2-CNB15L 8-Outlet PDU is engineered for mission-critical environments where uptime matters. Designed to manage non phase synchronized AC power sources, this intelligent ePDU uses an automatic transfer switch to monitor both input sources and deliver a seamless, interruption-free transfer from primary to secondary power. Built for reliability in data centers, laboratories, healthcare facilities, and industrial settings, it delivers robust power distribution coupled with smart switching to protect essential equipment from power disruptions and outages.

  • Seamless power uptime for critical equipment: This PDU leverages an automatic transfer switch to maintain uninterrupted operation of essential devices. When the primary source experiences a fault or instability, the ePDUs fast, controlled transfer to the secondary source minimizes downtime and prevents equipment reset, preserving system integrity and productivity.
  • Intelligent input monitoring: The eATS circuitry continuously watches both input sources, making real-time decisions to switch power with precision. This intelligent monitoring reduces the risk of arcing, snap transfers, and unnecessary toggling, delivering smooth transitions that your critical loads rely on during power disturbances.
  • Eight outlets in a compact, rack-ready package: The 8-outlet configuration provides scalable distribution within a space-saving enclosure. Designed for rack mounting, it simplifies cabling, improves airflow, and enables clean organization of critical devices such as servers, networking gear, and storage systems in a single, centralized power hub.
  • Enterprise-grade reliability and protection: Built for demanding environments, the eATS PDU delivers rugged construction, precise electrical performance, and dependable operation under continuous duty. Its robust design helps ensure consistent power delivery, reduces maintenance overhead, and supports equipment longevity in mission-critical applications.
  • Versatile applications for uptime-centric environments: Whether in data centers, telecom rooms, hospitals, or industrial facilities, this PDU provides dependable power switching and distribution to protect uptime. It supports administrators who require predictable power behavior, straightforward integration with existing power architectures, and clear visibility into power switching events.

Technical Details of Eaton eATS T2235-C2-CNB15L 8-Outlet PDU

  • Model: Eaton eATS T2235-C2-CNB15L
  • Outlet configuration: 8 outlets
  • Power source handling: Automatic transfer switch designed for non phase synchronized AC power sources
  • Monitoring: Intelligent circuitry monitors both input sources for fast, interruption-free transfer
  • Application: Ideal for critical equipment in data centers, healthcare facilities, labs, and other uptime-sensitive environments

How to install Eaton eATS T2235-C2-CNB15L 8-Outlet PDU

  • Plan and prepare: Assess your rack space and cabling layout. Ensure you have adequate clearance for airflow and easy access to outlets and power cables. Gather the appropriate mounting hardware compatible with your rack system.
  • Mount the PDU: Secure the eATS PDU in the rack using the appropriate mounting rails or brackets. Verify level alignment and tighten mounting hardware to prevent vibration and movement during operation.
  • Connect power sources: Connect the primary and secondary power feeds to the designated inputs in accordance with local electrical codes. Use properly rated cables and connectors, and keep both sources on separate circuits if advised by your facility’s electrical standards.
  • Route and label outlets: Attach critical devices to the eight outlets and label each outlet with its corresponding load to simplify management and maintenance. Ensure cable management supports airflow and reduces the risk of overheating.
  • Test the transfer function: With the system powered, simulate a primary source fault to verify the automatic transfer to secondary power. Confirm that connected devices experience no perceptible interruption during the switch and monitor for any abnormal indicators or alarms.

Frequently asked questions

  • Q: What is the primary benefit of the Eaton eATS T2235-C2-CNB15L? A: The primary benefit is uninterrupted power delivery to critical equipment through automatic transfer switching between non phase synchronized AC power sources, reducing downtime and protecting uptime-sensitive systems.
  • Q: How many outlets does this PDU have? A: It features eight outlets, designed to consolidate power distribution for multiple critical devices within a single rack unit.
  • Q: Is this PDU suitable for data centers? A: Yes. It is engineered for mission-critical environments such as data centers, healthcare facilities, labs, and industrial settings where dependable power is essential.
  • Q: Does the PDU provide surge protection or remote monitoring? A: The product description emphasizes intelligent input monitoring and fast transfer for uninterrupted power. For surge protection and remote monitoring capabilities, refer to the official data sheet or product specifications to confirm available features and any optional accessories.
  • Q: How should I install and test the transfer switch? A: Install the PDU in accordance with electrical codes, mount it securely in the rack, connect both power sources correctly, and run a controlled test by simulating a primary source interruption to ensure seamless transfer and proper operation of connected equipment.

Customer reviews

(0)

0 Out of 5 Stars


5 Stars
0
4 Stars
0
3 Stars
0
2 Stars
0
1 Star
0


Showing - Of Reviews


You may also like

Recently viewed