Eaton Managed rack PDU, 0U, 5-20P, L5-20P input, 1.92 kW max, 120V, 16A, 10 ft cord, Single-phase, Outlets: (8) 5-20R - TAA compliant

EatonSKU: 4185332

Price:
Sale price$1,184.45

Description

Eaton Managed Rack PDU G3: 0U, 8x 5-20R, 120V, 1.92 kW, 10 ft Cord

Power reliability and precise energy visibility come together in the Eaton ePDU G3 Managed rack PDU. Engineered for data centers, edge deployments, and high-density server environments, this compact 0U power distribution unit delivers billing-grade accuracy at the outlet level, delivering real-time insight through a local LCD display or over a network connection. With eight rugged 5-20R outlets and a 10-foot L5-20P input cord, it’s built to handle busy racks while providing the data you need to optimize uptime, energy efficiency, and cost management. The Eaton G3 design focuses on accuracy, control, and scalability, making it an essential component for modern IT infrastructure that must be monitored, managed, and reported with precision.

  • Billing-grade outlet-level metering: The ePDU G3 provides highly accurate measurements at each outlet, enabling precise chargeback, capacity planning, and energy analytics. View current, voltage, power, and energy metrics on the local LCD pixel display or pull data remotely over the network for centralized reporting.
  • Outlets and electrical specifications for dense deployments: Eight (8) individual 5-20R receptacles support common IT equipment using 5-20P plugs. The unit operates at 120V, single-phase, with a maximum load of 1.92 kW and a 16A rating, making it ideal for mixed racks of servers, storage, and networking gear without sacrificing space or reliability.
  • 0U, rack-mounted efficiency: Designed to fit into standard 19-inch racks without occupying valuable rack space, the PDU keeps power distribution close to the load while maintaining clean cable management and straightforward installation in tight environments.
  • Managed PDU with remote visibility and control: Beyond outlet metering, the G3 supports remote monitoring, alerting, and management. Integrate with DCIM tools and network monitoring suites to track energy usage, set thresholds, and receive proactive notifications that help prevent downtime and optimize energy costs.
  • Rugged, compliant, and ready for demanding environments: Built for the data center, this PDU adheres to industry standards and is TAA compliant, ensuring suitability for government and enterprise procurement. Its robust construction and reliable performance make it a dependable backbone for critical IT infrastructure in a compact, space-saving form factor.

Technical Details of Eaton Managed rack PDU, 0U, 5-20P, L5-20P input, 1.92 kW max, 120V, 16A, 10 ft cord, Single-phase, Outlets: (8) 5-20R - TAA compliant

  • Power Type: Single-phase
  • Input: L5-20P, 120V, 16A
  • Output Outlets: (8) 5-20R
  • Maximum Load: 1.92 kW
  • Cord Length: 10 ft
  • Rack Compatibility: 0U, fits standard 19" racks
  • Metering: Outlet-level, billing-grade accuracy; local LCD display and network data access
  • Management: Managed PDU with remote monitoring, alerting, and configurable settings
  • Compliance: TAA compliant

how to install Eaton Managed Rack PDU

Installing the Eaton ePDU G3 is a straightforward process designed for quick, reliable deployment in standard data center racks. Follow these steps to ensure a proper setup that optimizes visibility and control over your power distribution:

  • Prepare the rack space by confirming a clear 19" mounting area for the 0U PDU and ensuring access to a suitable 120V power source. Verify that the rack is grounded and that a proper circuit can support the 16A load rating.
  • Mount the PDU in the desired rack position using the provided hardware. The 0U footprint allows you to place the unit at the rear or side of the rack as needed to maintain clean cable management and airflow.
  • Connect the 10-foot L5-20P input cord to a compatible 120V power source or distribution path. Ensure the connection is secure and that you follow all local electrical codes for power distribution in your facility.
  • Route power cables from each device to the appropriate 5-20R outlets. Label outlets to support effective chargeback, asset tracking, and DCIM integration.
  • Power up the PDU and perform initial configuration: use the local LCD display to verify outlet metering is active, set up alert thresholds (e.g., current, voltage, and power usage), and configure network access if remote monitoring is desired. Test the outlets by powering connected equipment to confirm proper distribution and metering accuracy.

Frequently asked questions

  • What is a managed PDU? A managed PDU provides remote monitoring, control, and metering for power distribution in a rack. It allows you to view per-outlet energy data, set alerts, and integrate with DCIM or IT infrastructure management tools to optimize uptime and energy use.
  • How many outlets does this PDU have? The Eaton ePDU G3 shown here has eight (8) outlets of type 5-20R, suitable for common high-density IT devices.
  • What power and voltage does it support? It operates at 120V, single-phase, with a maximum load of 1.92 kW and a 16A rating. The input is L5-20P, 120V.
  • Is it compatible with DCIM and network monitoring? Yes. The PDU supports outlet-level metering data that can be accessed locally on the LCD and remotely over a network connection, enabling integration with DCIM and monitoring platforms for centralized power management.
  • Is the unit TAA compliant? Yes, this PDU is TAA compliant, making it suitable for government procurement and environments that require federal contracting standards.
  • What is the physical footprint? It is a 0U rack-mount PDU designed for dense racks, providing powerful power management without occupying valuable vertical space.

Customer reviews

(0)

0 Out of 5 Stars


5 Stars
0
4 Stars
0
3 Stars
0
2 Stars
0
1 Star
0


Showing - Of Reviews


You may also like

Recently viewed