Description
Eaton Tripp Lite Series 11.5kW 3-Phase Local Metered PDU
The Eaton Tripp Lite Series 11.5kW 3-Phase Local Metered PDU is engineered for data centers, server rooms, and IT environments where dependable power distribution and real-time visibility are essential. This high-capacity, 3-phase PDU delivers precise load monitoring at the rack level, enabling proactive capacity planning, smarter energy use, and reduced risk of unexpected outages. With robust connectivity options, rugged IEC-309 outlets, and a compact 0U vertical form factor, it fits seamlessly into standard IT racks while scaling to support growing equipment footprints.
- High-capacity, 11.5 kW 3-phase power distribution supports dense server, storage, and networking deployments without compromising reliability.
- 208-240V output configuration with 36 C13 outlets and 9 C19 outlets provides flexible, widely compatible power for mixed IT loads.
- Local metering with real-time load data enables immediate visibility into consumption, pinpoints potential overloads, and supports proactive capacity planning.
- IEC-309 red 16/20A outlets and a 360-415V input design ensure rugged performance in demanding data center environments and compatibility with three-phase power distribution systems.
- 6 ft (1.83 m) cord and 0U vertical rack-mount design simplify installation, optimize rack space, and integrate cleanly into standard IT cabinets; TAA compliant for government and enterprise deployments.
Technical Details of Eaton Tripp Lite Series 11.5kW 3-Phase Local Metered PDU
- Power rating: 11.5 kW capacity for demanding IT loads
- Phase: 3-phase local distribution for balanced power delivery
- Output voltage: 208-240V per outlet configuration
- Input voltage: 360-415V AC (three-phase input) to support common data center power feeds
- Outlet configuration: 36 x C13 outlets and 9 x C19 outlets to accommodate a wide range of devices
- Outlet type: IEC-309 red 16/20A connectors for clear identification and rugged reliability
- Cord length: 6 ft (1.83 m) lead for flexible routing in dense racks
- Mounting type: 0U vertical rack-mount, enabling seamless integration without consuming shelf space
- Metering: Local metered with real-time load data for immediate visibility and easier capacity management
- Compliance: TAA compliant for use in government and enterprise environments
how to install Eaton Tripp Lite Series 11.5kW 3-Phase Local Metered PDU
- Plan the rack layout to ensure adequate clearance and ventilation around the PDU and connected devices; verify that the rack supports 0U mounting and the vertical orientation.
- Power down the equipment and verify that the 360-415V three-phase supply is accessible and labeled, with appropriate overcurrent protection and phasing per local electrical codes.
- Mount the PDU into the rack’s vertical space, aligning the mounting rails and securing it with the provided hardware to ensure a stable, vibration-free installation.
- Connect the PDU’s input cord to the correct 360-415V power source, preserving proper cable routing to minimize stress on connectors and to maintain airflow around the device.
- Distribute loads by plugging servers, network equipment, and storage devices into the 36 C13 outlets and 9 C19 outlets; organize cables to prevent obstruction of cooling paths and to facilitate future changes.
- Power on the PDU and verify that the local metering displays reflect real-time load data; confirm that all outlets are delivering power and that protection devices are configured according to equipment specifications.
Frequently asked questions
- Q: What is the power rating of this PDU? A: 11.5 kW of three-phase power distribution capacity.
- Q: What outlets are supported? A: 36 C13 outlets and 9 C19 outlets provide broad compatibility for IT equipment, with rugged IEC-309 red 16/20A connectors.
- Q: What voltages does it handle? A: Output is 208-240V, while the unit accepts 360-415V input from three-phase power sources.
- Q: How is the PDU mounted in the rack? A: It is a 0U vertical PDU designed for unobtrusive, space-saving installation in standard IT racks.
- Q: Does this PDU include metering? A: Yes, it features local metering with real-time load data to help you monitor and manage electrical usage.
- Q: Is the product compliant with trade and acquisition standards? A: Yes, it is TAA compliant, making it suitable for government and enterprise procurement.
Customer reviews
Showing - Of Reviews
