Eaton Tripp Lite Series 2.9kW Single-Phase Local Metered PDU – 120V Outlets, 1U Rack-Mount
The Eaton Tripp Lite Series 2.9kW Single-Phase Local Metered PDU is a purpose-built power distribution unit designed to deliver reliable, high-efficiency power management for critical IT equipment. Engineered for data centers, network closets, and edge deployments, this 2.9 kW PDU combines solid construction with precise energy monitoring to help you optimize workloads, minimize downtime, and simplify capacity planning. With a compact 1U rack-mount footprint, a 15-foot cord, and twelve 5-15/20R outlets fed by a robust L5-30P input, this local metered PDU provides real-time visibility into power usage while delivering clean, organized distribution to servers, switches, storage devices, and other essential equipment. If you’re seeking a dependable, space-efficient solution to improve energy efficiency and operational reliability, this PDU stands out in its class.
- High-efficiency power distribution for data centers and networks. The 2.9 kW rating supports a broad range of equipment without overtaxing rack capacity, helping you maintain optimal performance and cooling efficiency. By consolidating power management into a single unit, you simplify wiring, reduce cable clutter, and improve airflow within your rack enclosure.
- Real-time local metering for precise energy visibility. This PDU features built-in local metering so you can monitor voltage, current, and power usage on the front panel. Real-time energy data supports proactive capacity planning, demand management, and cost allocation, enabling smarter budget decisions and easier problem diagnosis during peak load periods.
- Fully featured 12-outlet arrangement for flexible equipment provisioning. The twelve 5-15/20R receptacles provide compatibility with a wide range of standard IT devices. Whether you’re powering servers, switches, PDUs, or storage arrays, you can distribute power cleanly across a variety of devices in a single, organized package.
- Robust, space-saving 1U rack-mount design with a 15 ft cord. This compact profile fits seamlessly into standard 19-inch racks, preserving valuable rack space for critical gear. The long 15-foot (4.57 m) cord offers flexibility in positioning the PDU to connect with a distant power strip or power source, reducing the need for additional cabling and adapters.
- Input portability and safety for IT environments. Featuring a NEMA L5-30P input designed for 120V operation, this PDU supports reliable power delivery while simplifying plug compatibility with common data center power sources. The rugged build and rack-mount capability make it suitable for varied deployments, from small server rooms to large-scale data centers, delivering dependable power distribution with easy maintenance and quick troubleshooting.
Technical Details of Eaton Tripp Lite Series 2.9kW Single-Phase Local Metered PDU
- Power rating: 2.9 kW
- Input plug: NEMA L5-30P (120V)
- Cord length: 15 ft (4.57 m)
- Outputs: 12 x NEMA 5-15/20R receptacles
- Form factor: 1U rack-mount
- Metering: Local metering for real-time energy visibility (voltage, current, power)
- Voltage: 120V nominal
- Mounting: 19-inch rack-compatible, standard mounting rails
- Front accessibility: Meter display and outlets arranged for easy access and monitoring
How to install Eaton Tripp Lite Series 2.9kW Single-Phase Local Metered PDU
Installing this PDU is straightforward and designed to integrate smoothly into a standard IT rack environment. Follow these practical steps to ensure a safe, compliant, and reliable setup:
- Prepare the rack space: Identify a suitable 1U slot in a standard 19-inch rack with adequate clearance for the outlet panel and cable management. Ensure the area around the rack is clear of obstructions and meets your facility’s ventilation and safety requirements.
- Mount the PDU: Use the included mounting hardware to secure the PDU horizontally in the rack. Align the mounts with the rack rails, tighten screws evenly, and verify the unit is firmly seated to prevent vibration or movement during operation.
- Connect the power input: Plug the PDU’s 15 ft cord into a properly rated 120V power source using the L5-30P input. Confirm that the power source is dedicated or appropriately sized for the expected load, and avoid overloading adjacent circuits to maintain stable operation.
- Route and connect outlets: Organize power cables from the twelve 5-15/20R outlets to your equipment. Use cable ties or management channels to minimize tangling and airflow disruption. Assign outlets to devices with a clear labeling scheme for quick identification during maintenance or troubleshooting.
- Power on and verify: After connection, power on the devices and observe the local meter readouts on the PDU’s front panel. Confirm that voltage, current, and power readings align with your equipment specifications and that there is no abnormal flicker or error indication on the meter display.
- Documentation and verification: Record the PDU’s model, serial number, outlet assignments, and metering readings for future reference. Periodically monitor energy usage to optimize workloads and improve efficiency across your IT infrastructure.
Frequently asked questions
- What is a local metered PDU? A local metered PDU provides on-board metering that reports real-time input voltage, current, and power usage at the rack level. It enables visibility into how much electricity your IT gear draws, helping you manage capacity, allocate costs, and optimize power distribution without relying solely on external meters.
- How many outlets does this PDU provide? The Eaton Tripp Lite Series 2.9kW Local Metered PDU features 12 outlets of type NEMA 5-15/20R, offering flexible connectivity for standard IT devices commonly used in data centers and network closets.
- What is the input configuration? It uses a NEMA L5-30P input designed for 120V operation, paired with a 15-foot cord to reach suitably placed power sources within typical rack environments.
- What is the form factor and mounting compatibility? This PDU is a 1U, 19-inch rack-mount unit, designed to fit standard server racks and integrate seamlessly with other rack-mounted IT equipment and PDUs.
- How can I maximize energy efficiency with this PDU? By leveraging the local metering readings to monitor real-time load, you can balance devices across outlets, identify underutilized or overburdened circuits, and adjust workloads to reduce peak demand. Regularly reviewing meter data helps you plan capacity, optimize cooling, and potentially lower energy costs.
Customer reviews