Eaton Tripp Lite Series 3.8kW 200-240V Single-Phase ATS/Local Metered PDU - 8 C13 and 2 C19 Outlets, Dual C20 Inlets, 12 ft. Cords, 1U, TAA

Tripp Lite by EatonSKU: 6353202

Price:
Sale price$489.62

Description

Eaton Tripp Lite Series 3.8kW 200-240V Single-Phase ATS/Local Metered PDU

The Eaton Tripp Lite Series 3.8kW 200-240V Single-Phase ATS/Local Metered PDU is built for reliability in network-grade environments. This high-performance power distribution unit combines automatic transfer switching with precise local energy metering, giving you proactive visibility and control over critical loads. Designed to fit compact data centers, server rooms, and network closets, this 1U PDU delivers flexible outlet configurations and dual inlets to support dual-power configurations, helping maximize uptime and protect sensitive equipment. With two rugged 12-foot cords and a durable rack-mount form factor, it’s engineered to simplify wiring, improve energy management, and streamline maintenance in environments where every watt and every second of uptime matters.

  • ATS-enabled power distribution with automatic transfer between two independent 200-240V AC sources ensures continuous operation of critical devices during source interruptions. This intelligent switching minimizes downtime, reduces the risk of data loss, and supports high-availability workloads in data centers and enterprise IT closets. The ATS capability is designed to keep servers, storage, networking gear, and other essential equipment online while seamlessly transitioning to the backup source when needed.
  • Local metering provides real-time insight into energy usage at the PDU level, delivering voltage, current, power (kW), and energy (kWh) readings directly at the rack. This visibility supports accurate capacity planning, chargeback, and energy management initiatives, helping you optimize power distribution and identify potential issues before they impact performance. Expect clear readouts that empower IT and facilities teams to monitor load trends and stay within safe operating thresholds.
  • Outlet configuration includes 8 x IEC 60320 C13 outlets and 2 x IEC 60320 C19 outlets, offering flexible support for a mix of equipment such as servers, NAS devices, switches, blade enclosures, KVMs, and network appliances. The balanced mix of C13 and C19 outlets simplifies cabling, consolidates power management, and supports diverse devices with varying power requirements. This layout helps you distribute loads effectively and reduce outlet clustering in dense rack environments.
  • Dual IEC 60320 C20 inlets paired with 12 ft cords provide versatile placement options and easier integration into multi-rack racks or front/back power routing. The dual-inlet design supports redundant power feeds from separate circuits, improving availability and resilience for critical IT gear. The long cords give you flexibility to route power where it makes the most sense within your data center, minimizing cable clutter and improving airflow around deployed devices.
  • 1U rack-mount form factor with TAA compliance makes this PDU an ideal choice for space-constrained racks and government procurement. The compact footprint delivers robust power management without sacrificing rack space, while the TAA compliance ensures compatibility with procurement requirements in many regions. This combination makes it suitable for a wide range of deployments, from edge data centers to enterprise server rooms, without sacrificing performance or reliability.

Technical Details of Eaton Tripp Lite Series 3.8kW 200-240V Single-Phase ATS/Local Metered PDU

  • Power capacity: 3.8 kW
  • Input voltage: 200-240V AC, single-phase
  • Outlet configuration: 8 x IEC 60320 C13 outlets; 2 x IEC 60320 C19 outlets
  • Inlets: Dual IEC 60320 C20 inlets
  • Cord length: 12 ft (per cord) for flexible rack placement
  • Form factor: 1U rack-mount
  • Metering: Built-in local metering with real-time energy readings (voltage, current, kW, kWh)
  • Compliance: TAA-compliant for government procurement
  • Application: Suitable for data centers, server rooms, and network closets requiring reliable UPS-free power distribution with metering

How to Install Eaton Tripp Lite Series 3.8kW 200-240V Single-Phase ATS/Local Metered PDU

  • Prepare your rack and identify a suitable 19-inch mounting location for the 1U PDU ensuring adequate clearance for airflow and cabling.
  • Mount the PDU securely in the rack using standard rails or mounting hardware appropriate for your enclosure (hardware not included with the PDU in most kits).
  • Connect the two IEC 60320 C20 inlets to two independent 200-240V power sources to enable automatic transfer switching. Verify that each source is properly energized and protected by appropriate circuit breakers.
  • Route and connect your IT equipment to the 8 C13 and 2 C19 outlets, distributing loads to maintain balanced power across the two input sources. Avoid overloading any single outlet bank and follow equipment power ratings.
  • Power on the PDU and verify the local metering readouts. Confirm that the ATS is functioning by simulating a source interruption and observing the transfer to the alternate source without interrupting connected devices.
  • Organize cables for optimal airflow and easy maintenance. Label each outlet if necessary to simplify future asset management and electrical audits.
  • Configure any optional monitoring or alerting features as supported by the PDU (e.g., threshold alarms or remote monitoring capabilities) to stay informed about power conditions in real time.
  • Test under typical load conditions to ensure stable operation, verify energy readings, and confirm proper distribution across outlets. Regularly review metering data to identify potential peak loads and schedule capacity planning accordingly.

Frequently asked questions

  • What does ATS/Local Metered mean on this PDU? ATS stands for Automatic Transfer Switch. This feature enables seamless switching between two independent power sources to keep critical equipment running during an outage. Local metered means the PDU provides on-site energy readouts (voltage, current, power, and energy) so you can monitor consumption and manage loads directly at the rack without relying solely on upstream sensors.
  • What outlets are included and how are they configured? The unit provides 8 IEC 60320 C13 outlets and 2 IEC 60320 C19 outlets, designed to accommodate a mix of servers, network gear, storage devices, and other IT equipment. The dual C20 inlets support two power feeds, enabling redundancy and more flexible wiring options in dense rack environments.
  • Is this PDU suitable for data centers and enterprise IT rooms? Yes. Its 1U form factor, dual-power-input capability, and metering features make it well-suited for data centers, server rooms, and network closets where reliable power distribution and energy visibility are essential for uptime and cost management.
  • Is the PDU government-friendly? The PDU is TAA-compliant, which is often required for government procurement in North America, enabling easier budgeting and compliance for public sector deployments.
  • How long are the cords and how does cabling affect installation? The PDU uses 12-foot cords, offering flexibility in rack layouts and cable management. Properly routing and labeling cables helps optimize airflow and simplifies future maintenance and scalability.
  • What maintenance or monitoring should I perform? Regularly review the local metering readouts to track voltage stability, current draw, and energy usage. Periodically test the ATS transfer, inspect cords and inlets for wear, and verify that the PDU remains within safe operating thresholds to protect connected equipment.