Description
Eaton Tripp Lite Series 3.8kW Single-Phase Local Metered Automatic Transfer Switch PDU
The Eaton Tripp Lite Series 3.8kW Single-Phase Local Metered Automatic Transfer Switch PDU is engineered for reliability in demanding data centers, server rooms, and network closets. This compact 1U PDU combines precise local energy metering with a built‑in automatic transfer switch (ATS) to keep critical IT loads online during power disturbances. Designed to fit standard 19-inch racks, it provides flexible input and output options, enabling seamless integration with dual power feeds and a wide range of equipment. With two 200–240V C20 inlets, eight C13 outlets, and two C19 outlets, this PDU delivers scalable power distribution and simplified cable management for modern IT environments. Whether upgrading an aging power system or building a new rack, this unit delivers efficiency, visibility, and reliability in a compact footprint.
- High-availability power distribution: The integrated Automatic Transfer Switch (ATS) ensures seamless failover between feeds, minimizing downtime for critical loads. Local metering provides real-time visibility into voltage, current, and energy usage, helping IT teams monitor capacity and optimize efficiency without external metering hardware.
- Redundant, flexible power inputs: Equipped with two 200–240V C20 inlets, this PDU supports dual feeds for improved availability. Redundant input paths allow maintenance without interrupting connected equipment, and the C20 inlets accommodate common data center power configurations with minimal cabling complexity.
- Versatile outlet configuration for mixed IT gear: The unit features eight C13 outlets and two C19 outlets, offering broad compatibility with servers, storage devices, switches, and other network gear. The arrangement enables clean, organized cabling and easier management of power distribution across the rack.
- Compact 1U design for space efficiency: At 1U height, this PDU maximizes rack real estate while delivering robust power distribution. Its slim profile is ideal for dense data centers, labs, and edge deployments where space is at a premium, yet reliability cannot be compromised.
- TA A-compliant, data center-ready: This PDU is TAA-compliant, meeting procurement requirements for government and regulated environments. Its rugged construction, energy metering, and transfer switching capabilities are tailored for enterprise use, ensuring long service life in demanding conditions.
Technical Details of Eaton Tripp Lite Series 3.8kW Single-Phase Local Metered Automatic Transfer Switch PDU
- Model: Eaton Tripp Lite Series 3.8kW Single-Phase Local Metered ATS PDU
- Power rating: 3.8 kW
- Voltage and input: 200–240 VAC, two C20 inlets for dual feeds
- Outlets: Eight C13 outlets and two C19 outlets
- Form factor: 1U rack-mount
- Metering: Local energy/ power monitoring (per-input and per-output visibility to support capacity planning)
- Protection and switching: Built-in Automatic Transfer Switch (ATS) for failover between feeds
- Mounting: Standard 19-inch rack compatibility
- Compliance: TAA-compliant for government and regulated environments
- Application: Data centers, server rooms, network closets, edge deployments
How to Install Eaton Tripp Lite Series 3.8kW Single-Phase Local Metered Automatic Transfer Switch PDU
- Prepare the installation site by ensuring adequate clearance for ventilation and cable routing. Verify that the rack area accommodates the 1U PDU height and allows easy access to the two C20 inlets and all outlets.
- Power down the equipment in the rack and isolate both power feeds. Connect the two 200–240V C20 inlets to dedicated power circuits that are sized to support the PDU’s 3.8 kW rating, following your facility’s electrical safety procedures.
- Mount the PDU securely in the rack using the supplied mounting hardware. Align the C20 inlet locations with your power distribution channels and ensure cables are neatly managed to minimize airflow disruption and reduce strain on connectors.
- Connect IT loads to the eight C13 outlets and the two C19 outlets, distributing critical devices to appropriate outlets. Maintain proper separation of heavy-load servers and storage devices to prevent outlet crowding and ensure even heat distribution within the rack.
- Power on the dual feeds and verify operation. Check that the local metering displays are active and that the ATS can transfer between feeds without interruption. Run a simulated transfer to confirm automatic failover works as intended, and document results for future maintenance.
Frequently asked questions
- Q: What is the primary purpose of this PDU? A: It provides reliable power distribution for critical IT equipment while offering local metering and automatic transfer switching to protect loads from power disturbances.
- Q: How many outlets does it have and what types? A: It includes eight C13 outlets and two C19 outlets, suitable for common servers, storage, and networking gear.
- Q: Can it operate with dual power feeds? A: Yes, it is designed with two 200–240V C20 inlets to support redundant feeds and enhance uptime.
- Q: Is this PDU suitable for government or regulated environments? A: Yes, it is TAA-compliant, meeting procurement requirements for such environments.
- Q: What kind of monitoring does it provide? A: It offers local metering to monitor voltage, current, and energy usage, delivering visibility for energy management and capacity planning within a 1U footprint.
Customer reviews
Showing - Of Reviews
