Eaton Tripp Lite Series 3.8kW Single-Phase Local Metered PDU, Dual Circuit, 120V Outlets (32 5-15/20R), L5-20P/5-20P, 10 ft. (3.05 m) Cord, 0U Vertical

Tripp Lite by EatonSKU: 1814146

Price:
Sale price$441.14

Description

Eaton Tripp Lite Series 3.8kW Single-Phase Local Metered PDU, Dual Circuit, 120V Outlets (32 5-15/20R), L5-20P/5-20P, 10 ft. (3.05 m) Cord, 0U Vertical

The Eaton Tripp Lite Series 3.8kW Single-Phase Local Metered PDU is a purpose-built power distribution solution for data centers, server rooms, and network closets that demand reliable, scalable, and energy-conscious electrical management. Designed to support dual circuit feeds and a broad mix of IT equipment, this PDU combines precise local metering with a compact 0U vertical footprint, enabling efficient rack utilization without compromising on performance or visibility. Whether you’re deploying high-density servers, storage arrays, or networking gear, this unit delivers clean, balanced power distribution, real-time energy data, and the flexibility required to maintain uptime and optimize energy costs across your IT infrastructure.

  • Dual-circuit power distribution in a single, compact PDU provides enhanced redundancy and flexibility for critical workloads. This design helps balance loads across independent feeds and reduces the risk of simultaneous circuit overloads, supporting mission-critical operations in data centers and server rooms.
  • Local metering offers real-time visibility into electrical usage and load on each circuit. With immediate access to energy consumption data at the rack level, administrators can monitor power health, identify imbalances, and implement capacity planning strategies that lower operating costs and extend equipment life.
  • 32 mixed 5-15/20R receptacles deliver broad compatibility for a wide range of IT equipment, from blade servers to network switches and storage devices. The combination of 5-15R and 5-20R outlets simplifies deployments and reduces the need for excessive adaptors, while supporting both standard and heavier-duty loads.
  • 0U vertical rack-mount design maximizes cabinet space utilization. By mounting in the vertical plane, this PDU frees horizontal rack space for equipment and cabling, helping maintain tidy cable management and improving airflow and accessibility for maintenance and upgrades.
  • 10 ft. (3.05 m) power cord and dual input connectors (L5-20P/5-20P) provide wiring flexibility to fit varied data-center layouts and electrical configurations. The long cord reaches distant power sources, while dual connectors enable options for separate feeds or test/maintenance without interrupting active power.

Technical Details of Eaton Tripp Lite Series 3.8kW Single-Phase Local Metered PDU

  • Power rating: 3.8 kW (single-phase) for efficient distribution of mid-to-high density IT equipment
  • Voltage: 120V nominal, suitable for standard IT outlets and equipment in North American deployments
  • Outlets: 32 x 5-15R / 5-20R mixed receptacles to support a wide range of devices
  • Input connectors: Dual circuit configuration with L5-20P / 5-20P compatibility for flexible power feeds
  • Cord length: 10 ft. (3.05 m) to reach distant power sources or distribution points
  • Mounting: 0U vertical rack-mount design for space-efficient integration inside standard 19-inch racks
  • Metering: Local metering with real-time energy and load data accessible at the PDU level
  • Phase: Single-phase distribution optimized for typical data-center granularity and ease of integration

How to install Eaton Tripp Lite Series 3.8kW Single-Phase Local Metered PDU

  • Prepare the rack: Confirm you have a standard 19-inch rack with sufficient vertical clearance for a 0U vertical PDU and a stable mounting surface. Ensure the rack can support the weight of the PDU and connected devices.
  • Mount the PDU: Use the provided mounting hardware to attach the PDU securely in the 0U vertical space of the rack. Align the unit so that the input cords can reach power sources without sharp bends or excessive tension on cables.
  • Connect power feeds: Attach the dual input connectors (L5-20P and/or 5-20P) to independent power sources or to a dual-feed distribution path as dictated by your facility’s electrical design. Verify that each feed is correctly wired and that circuit breakers are sized for the expected load.
  • Connect loads: Plug your IT equipment into the 32 outlets (32 x 5-15R/5-20R). Distribute devices to balance load across both circuits and minimize peak demand on any single feed. Use cable management to keep cords orderly and prevent tangling that could obscure airflow.
  • Power up and verify: Turn on power to the dual feeds and confirm the PDU’s local metering display initializes. Check the real-time load readings, ensure that all outlets are delivering power, and verify that any indicators correspond to expected operating conditions. Conduct a brief functional test by powering a subset of devices to confirm stable operation.
  • Document and label: Record the circuit assignments, load distribution, and outlet layout. Label cords and devices to simplify future maintenance, upgrades, or expansion. Establish a routine to monitor energy usage and adjust load distribution as needed to maintain efficiency and uptime.

Frequently asked questions

  • What is the power rating of this PDU? The Eaton Tripp Lite Series 3.8kW Single-Phase Local Metered PDU is rated at 3.8 kilowatts, designed to support typical mid-to-high density IT deployments while providing reliable power distribution and energy visibility.
  • How many outlets does it have and what types? It features 32 outlets of 5-15R and 5-20R configurations, offering broad compatibility for standard IT devices and heavier loads where needed within a single cabinet footprint.
  • Does this PDU require dual power feeds? Yes. The unit is described as dual circuit, with input connectors (L5-20P/5-20P) designed to accommodate two independent feeds for redundancy and better load balancing.
  • What kind of visibility does the PDU provide? The unit includes local metering, giving real-time readings of energy usage and circuit load directly at the PDU, helping with capacity planning, energy management, and uptime assurance.
  • What is the form factor and installation method? The PDU is a 0U vertical unit designed for mounting in a standard 19-inch rack. It saves horizontal rack space while keeping power distribution within easy reach of connected devices.
  • What is the length of the power cord? The model includes a 10 ft. (3.05 m) cord to reach distant power sources or power distribution points within the data center or equipment room.

Customer reviews

(0)

0 Out of 5 Stars


5 Stars
0
4 Stars
0
3 Stars
0
2 Stars
0
1 Star
0


Showing - Of Reviews


You may also like