Description
Eaton Tripp Lite Series 5.5kW Local Metered PDU — 208/230V, 16 C13 + 2 C19, L6-30P, 12 ft Cord, 2U Rack-Mount, TAA
Power reliability and visibility meet in this high-performance, single-phase local metered power distribution unit from the Eaton Tripp Lite Series. Engineered for data centers, server rooms, and IT closets that demand efficient, scalable power, this 5.5kW PDU delivers clean, distributed 208/230V power with built-in metering to help you manage load, anticipate capacity needs, and optimize energy use. With a robust 30A maximum capacity (agency-derated to 24A continuous), a long 12-foot cord, and two independently breakered load banks, this 2U rack-mount PDU is designed to fit in tight spaces without compromising on safety, reliability, or performance.
- High-capacity power distribution: 30A maximum capacity at 208/240V, derated to 24A continuous as required by agency standards, ensuring reliable delivery to critical devices while staying within NEC/UL guidelines.
- Extensive outlet configuration: 18 outlets total—16 C13 and 2 C19—to support a range of servers, storage, and networking gear, all distributed across two independently breakered load banks (9 outlets per bank) for responsive power control and improved fault isolation.
- Long, flexible power input: 12 ft (3.66 m) attached cord with a L6-30P input plug, enabling versatile placement in racks and rooms while maintaining safe, code-compliant wiring arrangements.
- Rugged, space-saving design: Horizontal 2U rack-mount enclosure with a compact footprint that fits standard 19-inch racks, ideal for dense data centers and telecommunication cabinets; TAA-compliant for government and enterprise deployments.
- Built-in metering for energy visibility: Local metering provides real-time measurements of voltage, current, power, and energy usage, helping IT teams monitor load trends, balance banks, and optimize capacity planning without additional equipment.
Technical Details of Eaton Tripp Lite PDUMH30HV
- Maximum capacity: 30A at 208/240V (agency derated to 24A continuous)
- Outlets: 18 total (16 x C13, 2 x C19)
- Input: Attached 12 ft / 3.66 m cord with L6-30P plug
- Configuration: Horizontal 2U rack-mount PDU with two independently breakered load banks (9 outlets per bank)
- Metering: Local metering for real-time monitoring of power usage
- Compliance: TAA-compliant for government and enterprise deployments
How to install Eaton Tripp Lite Series 5.5kW Single-Phase Local Metered PDU
Installing this PDU is straightforward and designed to integrate seamlessly into standard 19-inch server racks. Begin by selecting a suitable rack location that provides clear clearance for the 12-foot cord and allows easy access to outlets for cable management and maintenance.
Step 1 — Prepare the rack space: Ensure the rack has adequate 19-inch mounting rails and enough vertical space for a 2U device. Confirm there is proper ventilation around the rack and that the floor can support the weight of the fully loaded PDU and equipment.
Step 2 — Mount the PDU: Align the PDU with the rack rails and secure it using the appropriate screws for your enclosure. Because this is a horizontal, 2U unit, insert it at the desired height and tighten fasteners to prevent any movement during operation.
Step 3 — Connect the input power: Route the 12 ft L6-30P input cord from the PDU to a suitable L6-30R outlet in the building or rack power distribution system. Ensure the connection is secure and that the cord has ample slack to prevent strain during operational use.
Step 4 — Organize outlets and plan load distribution: Before powering on, map the two load banks (9 outlets each) to the devices they will serve. Plan to balance critical servers across both banks to optimize performance and prevent overloading a single bank in case of surge or maintenance.
Step 5 — Connect devices and enable monitoring: Plug servers, storage, and networking equipment into the C13 and C19 outlets as designated. Power up the equipment and verify that the local metering display (or onboard indicators) shows healthy voltage and current readings. Use the onboard metering to monitor real-time power usage and energy trends, and adjust device placement if load imbalances appear.
Step 6 — finalize cable management and labeling: Use cable ties or Velcro straps to secure power cords along the rack rails, clearly labeling each outlet bank and outlet group to simplify future maintenance. Consider documenting outlet assignments in your data center management system for quick reference during audits or capacity planning.
Step 7 — ongoing maintenance and monitoring: Periodically review the metered data to track consumption patterns, identify peak usage times, and plan for future expansion. If your environment requires remote monitoring, consult Eaton Tripp Lite accessories or enterprise-grade monitoring solutions that integrate with the PDUMH30HV’s data outputs, while ensuring you remain compliant with your facility’s security and data policies.
Frequently asked questions
- Q: What outlets does this PDU provide? A: It provides 18 outlets in total—16 C13 and 2 C19—distributed across two independently breakered load banks with 9 outlets per bank.
- Q: What is the maximum power capacity and continuous rating? A: The PDU has a maximum capacity of 30A at 208/240V, but is derated by agency requirements to 24A continuous for safe operation and compliance.
- Q: What kind of input plug is used? A: The unit uses an attached 12 ft cord terminated with an L6-30P input plug for compatibility with standard high-amperage rack power distribution.
- Q: Is this PDU suitable for 19-inch rack installations? A: Yes. It is a horizontal 2U rack-mount PDU designed to fit standard 19-inch racks while preserving space for cable management and airflow.
- Q: Does this PDU provide energy metering? A: Yes, it is a local metered PDU that offers real-time monitoring of electrical parameters, helping you manage load, capacity, and energy efficiency directly at the rack.
Customer reviews
Showing - Of Reviews