Middle Atlantic Remote Power Switch, Decora Mount

Middle AtlanticSKU: 5539430

Price:
Sale price$127.80

Description

Middle Atlantic Remote Power Switch, Decora Mount

The Middle Atlantic Remote Power Switch with Decora mounting is a professional-grade control solution designed to simplify centralized power management for rack systems. This remote switch enables precise remote up/down sequence initiation, helping you orchestrate power cycles for AV, IT, and broadcast equipment with confidence. Built to integrate seamlessly with Middle Atlantic’s USC-6R Universal Sequencing Controller, it delivers dependable sequencing performance while keeping wiring clean and organized in busy equipment racks.

  • Effortless remote power control with up/down sequence initiation: Trigger power cycles from a centralized location, reducing the need to access individual equipment and promoting safer, more efficient rack operations. This capability is ideal for complex AV setups, network closets, and recording environments where startup and shutdown order matters for protecting equipment and ensuring proper boot sequences.
  • Reliable sequencing integration with the USC-6R: Designed to connect to the USC-6R Universal Sequencing Controller via a convenient RJ-45 jack and terminal block, enabling synchronized power management across multiple devices. The integration ensures predictable startup order, minimizes power surges, and helps extend the life of sensitive components by preventing abrupt power transitions.
  • Clear status indicators for quick diagnostics: Some models feature status LEDs that provide at-a-glance feedback on switch activity and sequencing status. This visibility accelerates troubleshooting and reduces downtime, letting technicians confirm that the correct sequence is in progress without needing to physically access the equipment.
  • Durable Decora mount design for professional racks: The Decora-style mounting hardware is engineered for secure attachment to Middle Atlantic products’ rack systems, delivering a clean, professional installation that blends with other rack components. The compact form factor enables flexible placement within the rack while maintaining cable management and airflow considerations.
  • Easy installation and scalable configuration: With straightforward wiring to the USC-6R and compatible power sources, this remote power switch fits easily into existing Middle Atlantic ecosystems. Its modular approach supports expansion as your rack grows, allowing you to add more switches or integrate additional sequencing points without reworking the entire control scheme.

Technical Details of Middle Atlantic Remote Power Switch, Decora Mount

  • Get this information from the "specifications" section of the product from https://ec.synnex.com/ using product "UPC" or "SKU" as reference

How to install Middle Atlantic Remote Power Switch, Decora Mount

Preparing for installation begins with a clear understanding of how the Remote Power Switch interfaces with your existing Middle Atlantic equipment and USC-6R controller. Start by selecting a convenient mounting location within the rack where the Decora switch can be easily accessed for maintenance while staying out of obstructive cable clutter. Ensure there is adequate ventilation around the unit to prevent overheating during long sequences. Gather the required cables: a standard power input, a RJ-45 communication cable for the USC-6R connection, and a terminal block link if your configuration uses it for LED status or additional control lines.

Step-by-step installation guidance:

  • Power down all affected equipment and verify that the rack is de-energized before starting any wiring work to avoid accidental shocks or equipment damage.
  • Mount the Decora Switch securely in the chosen rack location. Use the supplied mounting hardware to fasten the device in place, ensuring the unit is level and aligned with other rack components for clean cable routing.
  • Connect the RJ-45 communication interface from the Remote Power Switch to the USC-6R Universal Sequencing Controller. Confirm that the connection is snug and that the correct port is utilized as specified in your USC-6R documentation.
  • Wire the terminal block as needed for status indicators or to support any additional control signals your deployment requires. Double-check polarity and connection integrity to prevent signaling errors during operation.
  • Attach power straps or individual power cords to the switch as directed by your system design. Ensure the incoming power complies with the unit’s voltage specifications and that the circuit is properly rated for the connected devices.
  • Power up the system and run a basic test sequence. Initiate a startup and shutdown cycle to observe the order of device energization and de-energization, validating that the USC-6R is correctly sequencing all connected equipment.
  • Document the wiring diagram and sequence logic in your rack’s documentation set. This aids future maintenance and makes it easier for technicians to troubleshoot or expand the setup later.
  • Implement routine checks as part of your preventative maintenance. Periodically verify LED indicators, sequence timing, and connectivity to ensure long-term reliability and uninterrupted service.

Frequently asked questions

  • Q: What is the primary purpose of the Middle Atlantic Remote Power Switch, Decora Mount?
    A: It provides remote, centralized control of power sequencing for multiple rack devices, enabling orderly startup and shutdown to protect equipment and improve system reliability.
  • Q: How does it interact with the USC-6R Controller?
    A: It connects to the USC-6R via an RJ-45 jack and terminal block to receive sequencing commands and report status, allowing synchronized power management across connected devices.
  • Q: Can I mount this switch in any standard rack with Decora compatibility?
    A: Yes, the Decora mount design is intended for secure attachment to compatible Middle Atlantic rack systems, ensuring a clean, professional installation.
  • Q: Do LEDs indicate the sequencing status?
    A: Status LEDs are available on some switches to provide immediate visual feedback on activity and sequencing progress, simplifying diagnostics and monitoring.
  • Q: Is additional wiring or configuration required beyond connecting to the USC-6R?
    A: Basic installation requires power, the RJ-45 link to the USC-6R, and any optional terminal block connections. Advanced configurations may involve tailoring the sequence order and timing to match your equipment lineup.
  • Q: What kinds of equipment benefit most from this remote power switch?
    A: Systems with multiple rack-mounted devices that rely on a defined startup order—such as AV processors, amplifiers, network gear, and control interfaces—benefit the most by preventing inrush damage and reducing boot conflicts.

Customer reviews

(0)

0 Out of 5 Stars


5 Stars
0
4 Stars
0
3 Stars
0
2 Stars
0
1 Star
0


Showing - Of Reviews


You may also like

Recently viewed