Description
Powerware PW9155 10 kVA UPS with 32 Battery (2-High)
The Powerware PW9155 is a premium online backup power solution engineered to protect critical IT and electrical engineering infrastructure across corporate, healthcare, banking, and industrial environments. With a focus on delivering pristine, uninterrupted power, the PW9155 combines a compact footprint with maximum battery runtime, enabling organizations to safeguard sensitive equipment, maintain data integrity, and keep essential processes operating during outages or voltage fluctuations. This UPS is designed for scalable growth, offering flexible runtime options so you can extend battery life as your infrastructure evolves. Whether deployed in data centers, laboratories, or manufacturing floors, the PW9155 provides robust power protection that minimizes downtime and supports business continuity.
- Online, double-conversion topology delivers clean, isolated power to sensitive equipment, ensuring stable voltage and frequency even during grid disturbances.
- 10 kVA capacity to support critical loads with room for growth, helping you protect servers, networking gear, and control systems without overloading the UPS.
- 32 battery modules arranged in a compact 2-high configuration, enabling substantial runtime while preserving a small footprint for data center or equipment rooms with limited space.
- Scalable battery runtimes and modular design let you tailor protection to your exact needs, reducing total cost of ownership and simplifying capacity planning.
- Integrated power management and monitoring capabilities, empowering proactive maintenance, remote diagnostics, and secure shutdown of connected systems when needed.
Techncial Details of PW9155
- Model: Powerware PW9155
- Output rating: 10 kVA (appropriate for a wide range of IT and process loads)
- Battery configuration: 32 battery modules in a 2-high arrangement for extended runtime
- Topology: Online, double-conversion UPS protection delivers consistent power quality
- Footprint and footprint efficiency: compact design optimized to maximize runtime without occupying excessive floor space
- Intended use: Ideal for IT infrastructure, healthcare systems, banking operations, and industrial environments requiring reliable power protection
How to Install PW9155
- Plan the installation layout with adequate ventilation, clearance for service access, and proper cable management to ensure reliable operation and ease of future maintenance.
- Choose the appropriate mounting option (rack or tower) based on your site constraints, ensuring the unit is securely anchored and leveled to prevent vibration or movement during operation.
- Connect the PW9155 input to the building power source with correctly rated circuit breakers, following all local electrical codes and manufacturer recommendations for safety.
- Wire the critical load circuits to the UPS output, grouping devices by priority to optimize battery usage and ensure essential systems remain powered during an outage.
- Install and configure management interfaces (USB, serial, or optional network management card) to enable monitoring, alerts, and remote control of the UPS through compatible software or asset management tools.
- Connect the 32-battery bank, ensuring proper insertion and secure connections, then perform a battery self-test and inverter self-test per the user manual to verify operational readiness.
- Program operating modes, alarm thresholds, and shutdown procedures for connected equipment, and verify safe, orderly shutdowns in the event of extended outages.
- Schedule routine maintenance checks, battery health assessments, and firmware updates to maintain peak performance and extend the life of the system.
Frequently asked questions
-
Q: What loads can the PW9155 support?
A: The PW9155 provides a 10 kVA capacity suitable for a range of critical IT equipment, including servers, storage systems, networking gear, and other essential infrastructure. Exact load compatibility should be confirmed with your load profile and power factor considerations.
-
Q: How does the 32-battery configuration affect runtime?
A: The 32-battery bank is designed to deliver extended runtimes, especially at lower load levels. Runtime varies with the connected load and battery age, so consult the manufacturer’s runtime charts or use an exact calculation based on your anticipated load to determine the expected outage duration.
-
Q: Can I monitor and manage the PW9155 remotely?
A: Yes. The PW9155 supports standard management interfaces and can be paired with optional network management capabilities to enable remote monitoring, alerts, and scheduled shutdowns across your IT environment.
-
Q: Is the PW9155 upgradeable or configurable for future growth?
A: The unit is designed with scalable runtimes and a modular approach, allowing you to extend battery capacity and adjust protection levels as your infrastructure grows, helping protect the total cost of ownership over time.
-
Q: What installation considerations are important for reliability?
A: Ensure proper ventilation, clearance for service access, and adherence to electrical codes. Verify battery connections, perform regular self-tests, and maintain an accurate maintenance schedule to maximize uptime and system health.
Customer reviews
Showing - Of Reviews