Tripp Lite by Eaton 18.7kW 200-240V 3PH Monitored PDU - LX Interface, Gigabit, 36 C13 Outlets, IEC 309 60A Blue Input, LCD, 1.8 m Cord, 0U 1.8 m Height, TAA

Tripp Lite by EatonSKU: 5205769

Price:
Sale price$2,156.32

Description

Tripp Lite by Eaton 18.7kW 200-240V 3PH Monitored PDU with LX Interface

Designed for demanding data center environments, the Tripp Lite by Eaton 18.7kW 200-240V 3-Phase Monitored PDU with LX Interface combines rugged reliability with advanced remote management. This high-capacity monitored power distribution unit (PDU) is purpose-built for dense racks that require precise electrical control, real-time monitoring, and scalable power distribution. With a 3-phase 200-240V input, 36 C13 outlets, a blue IEC 309 60A input, built-in LCD, and Gigabit network connectivity, it provides centralized visibility and control for critical IT deployments while helping optimize energy use and uptime. The unit’s 0U footprint, long 1.8 m cord, and TA A compliance make it an ideal choice for data centers, server rooms, and colocation facilities seeking robust power management backed by a 2-year limited warranty.

  • High-capacity power distribution — Delivers up to 18.7 kW of reliable three-phase power, supporting dense server cabinets and high-density equipment without sacrificing performance or protection.
  • Advanced monitoring and control — Monitored PDU with LX interface enables real-time voltage, current, power, and temperature data, plus alerting and remote configuration through the Gigabit network.
  • Extensive outlet layout — Contains 36 C13 outlets to neatly distribute power across an entire rack ensemble, reducing cable clutter and simplifying organization for IT gear and peripherals.
  • Rugged, standards-based input — IT-grade IEC 309 60A blue input provides a secure, compliant connection to a 3-phase power source, ensuring stable delivery to mission-critical equipment.
  • Flexible installation and return on investment — 0U footprint with a 1.8 m cord and LCD display for easy local monitoring, quick setup, and seamless integration into existing rack ecosystems, backed by a 2-year limited warranty and TAA compliance.

Technical Details of Tripp Lite by Eaton 18.7kW 200-240V 3PH Monitored PDU

  • Power capacity: 18.7 kW total load capacity for data center scalability and high-density rack environments.
  • Voltage and configuration: 200-240 V, 3-phase operation to optimize electrical efficiency and balance across rack legs.
  • Outlets: 36 C13 outlets to support a wide range of servers, storage devices, and network equipment with standardized IEC connectivity.
  • Input connector: IEC 309 60A blue input for secure, compliant connection to a 3-phase power source.
  • Interface: LX interface provides local and remote monitoring capabilities with Gigabit Ethernet for integrated management across data center networks.
  • Display: Built-in LCD for quick at-a-glance status, diagnostics, and configuration without requiring network access.
  • Cord length: 1.8 m cord to accommodate diverse rack layouts and cabinet depths.
  • Footprint and mounting: 0U footprint suitable for flat rack mounting while consuming minimal rack space; designed for flexible deployment in standard data center racks.
  • Height and form factor: 1.8 m height configuration supports tall rack installations and specialized enclosures; designed for professional HVAC-conscious data centers.
  • Compliance and warranty: TAA-compliant with a 2-year limited warranty for enterprise reliability and long-term ownership value.

How to Install Tripp Lite by Eaton 18.7kW 3-Phase Monitored PDU

  • Plan and prep: Confirm that your rack and cabinet space can accommodate a 0U footprint PDU with a 1.8 m cord and ensure your electrical service provides a 60A three-phase circuit. Verify that your IT equipment’s power densities align with the PDU’s 18.7 kW capacity and that outlet labeling matches load distribution needs in your rack layout.

  • Mounting considerations: Install the PDU in a suitable rack or enclosure, leveraging the 0U design to maximize space. Secure the unit using appropriate rack rails and mounting hardware, ensuring clear airflow and accessibility to the LCD display for ongoing monitoring.

  • Connect the power input: Connect the IEC 309 60A blue input plug to a compatible 3-phase power source that matches the PDU’s electrical specifications. Verify proper phase balance and secure all connections to minimize arcing or loose contacts.

  • Attach and organize outlets: Route and connect devices to the 36 C13 outlets, dispersing loads across channels to optimize balance and prevent overloads on any single leg. Label critical devices for quick identification during maintenance or alert response.

  • Configure the LX interface: Power on the system and use the built-in LCD to access basic settings, then configure the LX interface for IP addressing, gateway, and SNMP or other management protocols as your network policy requires. Establish monitoring thresholds, alarms, and email or SNMP alerting to receive proactive notifications about voltage, current, and temperature deviations.

  • Validate and test: Confirm that all outlets are delivering stable power, monitor live readings through the LX interface, and test alerting logic to ensure alarms trigger correctly. Perform a staged load test to verify distribution across the three phases and confirm that the PDU maintains performance under expected peak conditions.

Frequently asked questions

  • Q: What makes this PDU suitable for 3-phase data centers?

    A: The 18.7 kW capacity at 200-240 V with a 3-phase input optimizes power distribution efficiency and supports high-density racks. The LX interface and Gigabit network enable centralized monitoring, fault detection, and fast remediation for critical workloads.

  • Q: How does the LX interface benefit remote management?

    A: The LX interface provides local and remote visibility into voltage, current, power, temperature, and outlet-level data. Its Gigabit Ethernet connection integrates with standard data center management ecosystems, enabling scalable monitoring, alerting, and automation across multi-rack deployments.

  • Q: How many outlets are available and how are they organized?

    A: The PDU features 36 C13 outlets, allowing dense distribution of power across an entire rack with organized cabling. Labeling and load balancing recommendations help prevent overloading any single outlet bank.

  • Q: What is the significance of the IEC 309 60A blue input?

    A: The IEC 309 60A blue input is a standardized, high-current, three-phase connector that ensures a secure, compliant connection to a suitable 60A circuit. This arrangement supports the PDU’s 18.7 kW capacity while maintaining reliability and electrical safety.

  • Q: Is this PDU compliant with data center procurement standards?

    A: Yes. The unit is TA A compliant and backed by a 2-year limited warranty, making it suitable for enterprise deployments, colocation facilities, and government or education environments that require documented compliance and reliable support.

  • Q: What kind of warranty does it include?

    A: The PDU comes with a 2-year limited warranty, reflecting Tripp Lite's commitment to reliability and long-term data center ownership value.


Customer reviews

(0)

0 Out of 5 Stars


5 Stars
0
4 Stars
0
3 Stars
0
2 Stars
0
1 Star
0


Showing - Of Reviews


You may also like

Recently viewed