Description
VERTIV Vertical Duct Panel (1 ft x 4 ft) – 1 Pack
The VERTIV Vertical Duct Panel (1 ft x 4 ft) is a precision-engineered solution for efficient airflow management and tidy cable routing in data centers, server rooms, and IT closets. Sized at 1 ft by 4 ft and packaged as a convenient 1-pack, this panel is designed to integrate seamlessly with Vertiv vertical duct systems, helping to optimize cooling performance while keeping infrastructure clean and organized. Whether you’re retrofitting an existing rack layout or building out a new facility, this panel delivers reliable operation under continuous, mission-critical conditions.
- Optimized cooling and airflow control — By reducing bypass air and aligning with vertical duct channels, this panel helps maintain uniform temperatures across racks, improving cooling efficiency and potentially lowering energy costs. Its precise fit minimizes turbulence and pressure differentials, supporting effective hot aisle/cold aisle configurations and consistent server performance.
- Durable construction designed for data-center environments — Built to withstand the demanding conditions of continuous operation, the panel provides rigid structural integrity and reliable performance over time. Its robust design sites within Vertiv’s duct ecosystem, offering long-term value even in high-density deployments.
- Easy integration with Vertiv systems — Engineered to be compatible with Vertiv vertical ducting solutions, this panel offers a straightforward install path within a modular cooling and airflow management strategy. It supports fast commissioning and scalable upgrades as you expand or reconfigure your data-center footprint.
- Modular, user-friendly installation — The 1 ft x 4 ft panel is designed for quick mounting and simple serviceability. Its modular form enables quick retrofits or additions without requiring specialized tools, reducing downtime and enabling flexible layouts as your IT needs evolve.
- Space-saving vertical design with clean aesthetics — The slim 1 ft x 4 ft profile helps maximize rack space while delivering a tidy, professional appearance. It enables streamlined cable routing and easier access to critical components, contributing to safer maintenance and improved airflow pathways.
Technical Details of VERTIV Vertical Duct Panel
- Dimensions: 12 in x 48 in (1 ft x 4 ft)
- Pack size: 1
- Product type: Vertical Duct Panel
- Brand: Vertiv
- Application: Vertical airflow management and cable routing within data centers and IT environments
How to install VERTIV Vertical Duct Panel (1 ft x 4 ft)
Before you begin, confirm that you have the correct Vertiv vertical duct components and mounting hardware compatible with your specific rack and cabinet configuration. Power down or isolate the area as required and ensure you follow site safety guidelines during installation.
Step 1: Prepare the installation area — Inspect the vertical duct framework where the panel will be mounted. Clear any obstructions, verify alignment with adjacent panels, and check for clean contact surfaces. Have all mounting hardware (screws, brackets, and gaskets) ready, and confirm that the panel’s orientation matches your airflow design (typically aligned with cold or conditioned air paths).
Step 2: Position the panel — With a helper if needed, align the 12 in x 48 in panel within the vertical duct channel. Ensure the panel sits flush against mounting points and that there is a consistent gap to allow air movement as intended. Avoid bending or forcing the panel into place, which can compromise performance and fit.
Step 3: Secure the panel — Use the appropriate mounting brackets or fasteners specified for your Vertiv duct system. Begin at one end and work methodically toward the opposite side, tightening screws evenly to prevent warping. Do not overtighten, as excessive pressure can damage the panel or surrounding ductwork.
Step 4: Check seal and alignment — After installation, inspect joints and edges for gaps where air could bypass the duct path. If gaskets or sealant are recommended by Vertiv for your setup, apply them to ensure a tight, controlled airflow channel. Recheck alignment to verify that the panel sits evenly and securely within the duct framework.
Step 5: Test airflow and system integration — Restore power to connected systems and monitor airflow through the duct panel. Look for even distribution across the panel and across nearby racks. If your data center employs monitoring sensors, verify that temperature and airflow readings reflect the intended performance. Make minor adjustments if required, then document the configuration for future maintenance.
Step 6: Maintenance and inspection — Establish a routine inspection interval to verify that fasteners remain secure and that no debris has accumulated along the panel’s surface or within the duct path. Clean surfaces as recommended by Vertiv and check for signs of wear that might indicate an upcoming service cycle.
For best results, install the Vertical Duct Panel as part of a comprehensive airflow management strategy. Combine it with properly sealed ducting, blanking panels, and temperature or airflow sensors to achieve optimal cooling efficiency. The 1-pack configuration is ideal for targeted upgrades or phased deployments, enabling you to incrementally enhance cooling performance while maintaining a clean, organized data-center environment.
Frequently asked questions
- Q: What is the primary purpose of the VERTIV Vertical Duct Panel? A: It serves as a dedicated component within vertical duct systems to guide airflow, reduce bypass leakage, and support orderly cable routing in data centers and IT rooms.
- Q: Is this panel compatible with all Vertiv ducting products? A: It is designed to integrate with Vertiv vertical duct systems, ensuring reliable fit and performance when used with compatible Vertiv components.
- Q: How many panels come in a single package? A: The product is sold as a 1-pack, suitable for single-panel installations or incremental upgrades.
- Q: Can I install this panel myself, or do I need professional help? A: The panel is designed for straightforward installation within compatible Vertiv duct assemblies. If you have experience with data-center hardware and ducting, you can install it yourself following the steps above; otherwise, request professional assistance to ensure optimal performance.
- Q: What maintenance is required after installation? A: Regular inspections for secure mounting, seal integrity, and clean airflow paths are recommended. Keep the panel free of debris and verify that surrounding duct components remain in good condition to maintain consistent cooling performance.
- Q: Where can I find compatibility and installation guidelines? A: Refer to Vertiv’s official product documentation and installation manuals for the most accurate compatibility notes and installer guidance tailored to your specific duct system configuration.
Customer reviews
Showing - Of Reviews