Description
Vertiv VRC Split Cooling System – 12,000 BTU / 3.5 kW, 208-230V, 6U Rack-Mount Indoor Unit (VRC201KIT)
The Vertiv VRC Split Cooling System is a state-of-the-art cooling solution engineered to protect vital IT equipment in compact data centers, network closets, and edge computing environments. Delivering reliable, precise cooling where space is at a premium, this system combines efficient 운영 with rugged reliability to safeguard servers, storage, and networking gear. With a robust capacity of 3.5 kW (equivalently 12,000 BTU per hour), the VRC201KIT is designed to maintain stable temperatures, minimize hotspots, and support consistent performance for rack-mounted deployments. Whether you are building a new micro data center, expanding a network closet, or supporting edge compute nodes, the Vertiv VRC Split Cooling System brings enterprise-grade cooling into a compact, easy-to-install package.
- Powerful cooling capacity: 3.5 kW (12,000 BTU/hr) to handle dense rack layouts and equipment with high heat output, keeping critical components within their optimal temperature range.
- Compact, rack-ready design: A 6U indoor unit that fits neatly into standard 19-inch racks, delivering effective cooling without consuming valuable floor space.
- Single-phase 208-230V operation: Aligns with common data-center electrical infrastructure, simplifying installation and reducing power distribution complexity.
- Split-system architecture: Separate indoor and outdoor components enable flexible placement, easier service access, and improved heat rejection for reliable operation in small rooms.
- Ideal for modern IT environments: Tailored for small server rooms, network closets, and edge computing setups where consistent temperature control and rack cooling are essential for uptime and performance.
Technical Details of Vertiv VRC Split Cooling System
- Model: VRC201KIT
- System type: Split cooling system designed for rack-mounted IT environments
- Cooling capacity: 3.5 kW (12,000 BTU/hr)
- Electrical: 208-230 V operation
- Indoor unit: 6U rack-mount design compatible with standard 19-inch racks
- Application: Rack and server room cooling for small data centers, network closets, and edge deployments
- Reliability: Built to support continuous IT workloads with stable, monitored temperature control
How to install Vertiv VRC Split Cooling System
Step 1 — Plan and prepare: Assess your rack space, airflow, and electrical supply. Ensure there is adequate clearance around the indoor unit and planned outdoor condenser location to permit proper heat rejection and airflow. Verify that the rack can accommodate a 6U indoor unit and that the electrical circuit is rated for 208-230V operation.
Step 2 — Mount the indoor unit: Install the 6U indoor unit into the selected rack position, using the included mounting hardware. Secure the enclosure firmly to prevent vibration and ensure cabinetwork clearance for service access and cable routing.
Step 3 — Route connections: Connect the refrigerant lines and communication wiring between the indoor and outdoor components. Ensure proper line routing to avoid kinks or sharp bends and maintain clearances for maintenance access. Route the power supply to the indoor unit as required by the system design, and ensure compatibility with your electrical panel and breakers.
Step 4 — Install the outdoor condenser (or separation point): Place the outdoor portion in a suitable outdoor or ventilated location with sufficient airflow. Securely connect the refrigerant lines, electrical wiring, and condensate drainage as per the installation instructions. Take care to seal any penetrations to prevent moisture ingress and ensure a clean, professional installation.
Step 5 — Commissioning and testing: Power up the system and run initial checks to confirm correct wiring and refrigerant connections. Configure the control settings, set temperature setpoints, and integrate with building management or IT monitoring where applicable. Verify cooling performance across typical server room conditions and monitor for leaks, unusual noises, or abnormal pressures. Schedule regular maintenance checks to preserve efficiency and reliability.
Step 6 — Start-up and optimization: After successful commissioning, monitor ambient conditions and equipment temperatures. Fine-tune temperature setpoints to balance energy use with rack safety, enable any fault alerts, and ensure consistent airflow through the rack and surrounding space. Routine cleaning of air filters and periodic inspection of electrical connections will help sustain peak performance for the VRC201KIT.
Frequently asked questions
-
Q: What is the cooling capacity of the Vertiv VRC Split Cooling System?
A: The unit delivers 3.5 kW (12,000 BTU/hr) of cooling capacity, designed for compact server rooms, network closets, and edge deployments that require reliable, precise temperature control. -
Q: What voltage does this system require?
A: The VRC201KIT operates at 208-230V, aligning with common data-center electrical infrastructure for straightforward installation and integration. -
Q: What does the VRC201KIT include?
A: The kit includes a split cooling configuration with a 6U indoor rack-mounted unit and the corresponding outdoor condenser section. It is designed for rack and server room cooling applications. -
Q: Where is this cooling system best used?
A: It is ideal for small data centers, network closets, and edge computing environments where space is limited but reliable rack cooling is essential to prevent hotspots and maintain equipment performance. -
Q: Is installation difficult, and who should install it?
A: Installation involves mounting the indoor unit in a rack, routing refrigerant and electrical connections, placing the outdoor unit, and commissioning the system. For safety and to ensure optimal performance, professional installation by qualified HVAC and IT personnel is recommended.
Customer reviews
Showing - Of Reviews